Space
between the arms (load height + clearance) multiplied by number of spaces
+
4.)
12"
minimum above top of last arm.
**Recommended
vertical clearance between arm and load is 6".
Cantilever
Base Length
The
cantilever base should be at least as long as the cantilever arms.
In
addition, a minimum height to depth ratio of 6 to 1 is recommended. For
example an 18' tall tower would require at least a 3' long base. A 24'
tower would require at least a 4' long base.
Cantilever
Tower and Base Anchorage
Each
tower must be securely anchored to the concrete with 1 -3/4" wedge
anchor.
Each
base must be securely anchored to the concrete with 2 -3/4" wedge
anchors.
3/4"
Wedge Anchors
Provide the
required anchorage of towers and base to concrete.
Require minimum
embedment of 4 3/4". Be sure your concrete slab is thick enough to
achieve minimum embedment.
Installation
Notes
All holes in the
base to tower connection must be used.
All towers must be
erected in a plumb condition on a concrete slab.
Torque all 3/4" bolts to
250 ft-lbs. Torque all 3/4" wedge anchors to 150 ft-lbs.
If provided, HR Installation
guides or drawings supercede all installation instructions. (For
example, different torques, different anchorage requirements, etc. may be
specified in installation guides or drawings.)